©2014 FIRECRACKER™GUW ALL RIGHTS RESERVED
Main boiler welded
(Click to enlarge photo)
Here is the main boiler with everything welded into place. I have also added the water connections for the water-jacket, there are two on top and one underneath. One of the top connections and the one underneath are supply and return, the other connection on top is an additional open-vent to the atmosphere (at the header-tank).
©2014 FIRECRACKER™GUW ALL RIGHTS RESERVED